• DocumentCode
    958409
  • Title

    Closed-loop job release control for VLSI circuit manufacturing

  • Author

    Glassey, C. Roger ; Resende, Mauricio G C

  • Author_Institution
    Dept. of Ind. Eng. & Operations Res., California Univ., Berkeley, CA, USA
  • Volume
    1
  • Issue
    1
  • fYear
    1988
  • fDate
    2/1/1988 12:00:00 AM
  • Firstpage
    36
  • Lastpage
    46
  • Abstract
    A closed-loop job release mechanism for job shops where the main source of randomness is due to machine failure and repair is introduced. The release policy adapts concepts of the reorder-point method of inventory control to the context of job-shop scheduling. The control mechanism, called starvation avoidance, is compared empirically with other input control mechanisms on several semiconductor wafer manufacturing job shops with favorable results
  • Keywords
    VLSI; closed loop systems; electronic engineering computing; integrated circuit manufacture; production control; scheduling; stock control; VLSI; closed-loop job release mechanism; inventory control; job shops; job-shop scheduling; machine failure; reorder-point method; repair; semiconductor wafer manufacture; starvation avoidance; Circuits; Computer integrated manufacturing; Costs; Delay; Job shop scheduling; Production facilities; Pulp manufacturing; Semiconductor device manufacture; Throughput; Very large scale integration;
  • fLanguage
    English
  • Journal_Title
    Semiconductor Manufacturing, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0894-6507
  • Type

    jour

  • DOI
    10.1109/66.4371
  • Filename
    4371