• DocumentCode
    987968
  • Title

    Symposium on Interconnection Conowingo Hydroelectric Project with Particular Reference to Interconnection

  • Author

    Eglin, W.C.L.

  • Author_Institution
    Vice-president and Chief Engineer, The Philadelphia Electric Company.
  • Volume
    47
  • Issue
    2
  • fYear
    1928
  • fDate
    4/1/1928 12:00:00 AM
  • Firstpage
    372
  • Lastpage
    381
  • Abstract
    This paper discusses the interconnection between three of the leading power supply companies in the eastern part of the country, the Philadelphia Electric Co., the Pennsylvania Power & Light Co., and the Public Service Electric & Gas Co. It outlines the physical aspects of the tie-in between the companies which is a 220-kv. ring of high-load capacity, triangular in shape with sides respectively 49 mi., 82 mi., and 77 mi. long. The advantages of the interconnection are enumerated as well as some of the operating problems. Preliminary to the discussion of the interconnection the paper discusses the Conowingo hydroelectric project, an important factor in the interconnection scheme. The plant has an initial installation of 280,000 ky-a. in generators.
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1928.5054993
  • Filename
    5054993