Symposium on Interconnection Conowingo Hydroelectric Project with Particular Reference to Interconnection
Author :
Eglin, W.C.L.
Author_Institution :
Vice-president and Chief Engineer, The Philadelphia Electric Company.
Volume :
47
Issue :
2
fYear :
1928
fDate :
4/1/1928 12:00:00 AM
Firstpage :
372
Lastpage :
381
Abstract :
This paper discusses the interconnection between three of the leading power supply companies in the eastern part of the country, the Philadelphia Electric Co., the Pennsylvania Power & Light Co., and the Public Service Electric & Gas Co. It outlines the physical aspects of the tie-in between the companies which is a 220-kv. ring of high-load capacity, triangular in shape with sides respectively 49 mi., 82 mi., and 77 mi. long. The advantages of the interconnection are enumerated as well as some of the operating problems. Preliminary to the discussion of the interconnection the paper discusses the Conowingo hydroelectric project, an important factor in the interconnection scheme. The plant has an initial installation of 280,000 ky-a. in generators.
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
Publisher :
ieee
ISSN :
0096-3860
Type :
jour
DOI :
10.1109/T-AIEE.1928.5054993
Filename :
5054993
Link To Document :
بازگشت