"Synchronized at the Load\´\´-III System tests and operating connections
Author
Searing, H.R. ; Milne, G.R.
Author_Institution
Assistant Electrical Engineer, United Electric Light & Power Company, New York, N. Y.
Volume
48
Issue
4
fYear
1929
Firstpage
1093
Lastpage
1100
Abstract
System test results, operating connections, and experience with the New York City system synchronized at the load are given. Data obtained by test are presented, showing the behavior of the system when generators are operated synchronized only through a low-voltage a-c. secondary network. The adaption of this method of connections to the New York City 60-cycle system, including system layout, station and feeder arrangement, and automatic recording apparatus is described. Experience with these connections has demonstrated that stable performance of prime movers is obtained, load and wattless control is simplified, oil circuit breaker duty is reduced, and voltage fluctuation at customer´s service during system disturbances is materially decreased.
Keywords
Circuit testing; Cities and towns; Feeds; Impedance; Integrated circuit interconnections; Power engineering and energy; Substations; System testing; Transformers; Voltage;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1929.5055358
Filename
5055358
Link To Document