• DocumentCode
    999400
  • Title

    III--Combined Reliability and Economy in Operation of Large Electric Systems

  • Author

    Anderson, J.W. ; Estrada, Herbert

  • Author_Institution
    System Planning Engineer, Philadelphia Electric Company.
  • Volume
    51
  • Issue
    4
  • fYear
    1932
  • Firstpage
    872
  • Lastpage
    878
  • Abstract
    This paper discusses the practises in use on the Philadelphia Electric Company system in attaining the maximum system economy consistent with high degree of service reliability. The system comprises not only steam electric stations of different efficiencies, but also a large hydroelectric plant and a major high-voltage interconnection with two large neighboring utilities, so that problems of operating economy are both highly important and complex in character. The paper also directs attention to problems of investment economy with a view toward securing the best balance of fixed charges, operating costs, and service reliability.
  • Keywords
    Boilers; Capacity planning; Costs; Performance analysis; Power generation economics; Production facilities; Substations; System performance; Turbines;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1932.5056181
  • Filename
    5056181