DocumentCode
999400
Title
III--Combined Reliability and Economy in Operation of Large Electric Systems
Author
Anderson, J.W. ; Estrada, Herbert
Author_Institution
System Planning Engineer, Philadelphia Electric Company.
Volume
51
Issue
4
fYear
1932
Firstpage
872
Lastpage
878
Abstract
This paper discusses the practises in use on the Philadelphia Electric Company system in attaining the maximum system economy consistent with high degree of service reliability. The system comprises not only steam electric stations of different efficiencies, but also a large hydroelectric plant and a major high-voltage interconnection with two large neighboring utilities, so that problems of operating economy are both highly important and complex in character. The paper also directs attention to problems of investment economy with a view toward securing the best balance of fixed charges, operating costs, and service reliability.
Keywords
Boilers; Capacity planning; Costs; Performance analysis; Power generation economics; Production facilities; Substations; System performance; Turbines;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1932.5056181
Filename
5056181
Link To Document