شماره ركورد
1047693
عنوان مقاله
Automatic under Voltage Load Shedding and Automatic Switching of Bus Reactors for Mitigating Fault Induced Delayed Voltage Recovery
پديد آورندگان
Farzan ،Rashidi University of Hormozgan, Bandar-Abbas - Electrical Engineering Department , Hassan ،Feshki Farahani Department of Engineering - Islamic Azad University - Central Tehran Branch
تعداد صفحه
7
از صفحه
171
تا صفحه
177
كليدواژه
Fault Induced Delayed Voltage Recovery , Air Conditioner , Induction Motor , Bus Reactor , Under Voltage Load Shedding
چكيده لاتين
This paper presents the application of automatic under voltage load tripping and switching of
shunt reactors as counter measures for fault induced delayed voltage recovery (FIDVR). As
dynamic behavior of loads has significant impact on simulating FIDVR, proper load modeling
is also discussed in this paper. Simulations conducted on actual network show that the
proposed load model is effectively able to simulate FIDVR. It also shown that automatic under
voltage load shedding and switching of shunt reactors can be used as counter measures for
reducing risk of voltage collapse or over voltage conditions that may take place following load
tripping caused by FIDVR.
سال انتشار
1396
عنوان نشريه
صنايع الكترونيك
فايل PDF
7575062
عنوان نشريه
صنايع الكترونيك
لينک به اين مدرک