شماره ركورد
413741
عنوان مقاله
تحليل و ارزيابي نقاط حادثه خيز( از ديدگاه شناخت محل حادثه، هزينه هاي ناشي از خسارات و ضايعات و راهكارهاي اصلاحي)
عنوان به زبان ديگر
The Analysis and Assessment of Black Spots
(From the Viewpoint of Accident Location Recognition,
Costs of Damages and Remedial Works)
پديد آورندگان
پورمعلم، ناصر نويسنده دانشگاه بين المللي امام خميني ( ره ) PourmoaLlem, N. , سليمي، محمدباقر نويسنده پليس راه استان كهگيلويه و بويراحمد Salimi, M.B.
اطلاعات موجودي
فصلنامه سال 1388 شماره 12
رتبه نشريه
علمي ترويجي
تعداد صفحه
24
از صفحه
25
تا صفحه
48
كليدواژه
accid ent- prone points , black spots , damage costs , remedial works , تصادفات جاده اي , هزينه خسارات و ضايعات , راهكارهاي اصلاحي , تحليل سلسله مراتبي , نقاط حادثه خيز , road traffic accidents , hierarchical analysis
چكيده لاتين
Roads, humans and vehicles are the three major factors in road traffic accidents
occurrence. Road geometry, as one of the fundamentals of the road environment, has
a key role in reducing human errors. The treatment or elimination of black spots has
a great influence in safety promotion, reducing the number of road traffic accidents,
and, subsequently, diminishiug damages. In this paper, the process of analysis and
assessment includes: 1) accident location identification, 2) costs of damages, and
3) remedial works.
Based on statistical analyses and assessments, engineering economics techniques and
hierarchical methods were carried out . As a case study, Shiraz-Israhan corridor,
which is an important arterial road in Iranʹs road network, was chosen. The results
are as follows:
1- Calculation of the accident costs shows the fact that the average costs of a fatal
accident is approximately 5 times the costs of an iujury accident and 9 times the
average of damage accidents.
2· The statistics and data confirm that %20 of accidents occur in the accident-prone
places (black spots). This represents the importance of treatment and investment for
safeguarding critical and accident-prone points in the roads.
3- The average of Benefit/Cost ratio (B/C) in executing safety improvement projects
in Shiraz-Isfahan corridor is 20.3, which shows the strong economic feasibility of
such projects.
4- The ranking for implementation of safety projects in a multi -criteria decision
making model is based on the number of accidents.
5- Accord ing to the accomplished analyses, the points and locations with more traflic
volum e have more priority for the implementation of safety projects.
سال انتشار
1388
عنوان نشريه
مطالعات مديريت ترافيك
عنوان نشريه
مطالعات مديريت ترافيك
اطلاعات موجودي
فصلنامه با شماره پیاپی 12 سال 1388
كلمات كليدي
#تست#آزمون###امتحان
لينک به اين مدرک