شماره ركورد :
530729
عنوان مقاله :
تحليل پايداري و طراحي سيستم نگهداري تقاطع تونلهاي آب بر با مخازن ضربه گير سد گتوند عليا
عنوان به زبان ديگر :
Stability Analysis and Support System Design of Intersection of Water Conveyance Tunnel and Surge Tank of Olia Gotvand Dam
پديد آورندگان :
شريفي بروجردي، محسن نويسنده Sharifi Brojerdi, M , ابتكار، اسماعيل نويسنده Ebtekar, E , معيني، عماد نويسنده دانشگاه بين المللي امام خميني (ره),دانشكده فني و مهندسي Moini, E , حسيني ، مهدي نويسنده دانشگاه شيراز hosseini, mahdi
اطلاعات موجودي :
دوفصلنامه سال 1389 شماره 10
رتبه نشريه :
علمي پژوهشي
تعداد صفحه :
6
از صفحه :
91
تا صفحه :
96
كليدواژه :
تحليل پايداري , تونلهاي آببر , مخازن ضربه گير , سد گتوند عليا , روش , FLAC3D , سيستم نگهداري
چكيده لاتين :
This study has been carried out on the stability analysis and the support systems design of the water conveyance tunnel and surge tank of Gotvand dam. The stability analysis of underground openings is one of the most important subjects in rock mechanics principles. There are four different methods for the analysis of underground openings. These are: closed form solutions, numerical methods, empirical methods and physical modelling. Nowadays the numerical and empirical methods are more widely used all over the world. In This research, analyses have been carried out by finite difference method (component of numerical methods) and Q and RMR (component of empirical methods) rock mass classifications. The numerical software used for analyzing the tunnel stability was Flac3D. This software is capable of determining the values of induced stresses and displacements around the underground openings. The results obtained from stability analyses show that the underground excavation is unstable; therefore, installation of a support system is necessary. After installation of support systems, the value of maximum displacement is less than Sakurai’s critical displacement, therefore, the underground excavation will be stable. The recommended support systems are: 1) Installation of systematic grouted bolt by 7m long and spacing 1.5×1.5m with shotcrete by 150mm thick in surge tank 2) ) Installation of systematic grouted bolt by 5m long and spacing 2×2 m and with shotcrete by 70mm in conveyance tunnel and box.
سال انتشار :
1389
عنوان نشريه :
م‍ه‍ن‍دس‍ي‌ م‍ع‍دن‌
عنوان نشريه :
م‍ه‍ن‍دس‍ي‌ م‍ع‍دن‌
اطلاعات موجودي :
دوفصلنامه با شماره پیاپی 10 سال 1389
كلمات كليدي :
#تست#آزمون###امتحان
لينک به اين مدرک :
بازگشت